1800 287 223 · [email protected]

Revit MEP services in Australia

ASTCAD provides Revit MEP services across Australia — mechanical, electrical and plumbing Revit modelling, coordination, clash detection and BIM documentation to NCC and Australian Standards, for engineers and builders in Brisbane, Sydney, Melbourne and Perth.

Our MEP team models in Revit MEP and coordinates with architectural and structural models using Navisworks. We deliver fully coordinated MEP Revit models, service drawings, equipment schedules and as-built documentation. All electrical work complies with AS/NZS 3000 and all mechanical work complies with AS 1668. Free quote within one business day.

Revit MEP services: scope and approach

ASTCAD’s Revit MEP services cover mechanical, electrical, hydraulic and fire services modelling with the coordination discipline that MEP work demands: real fittings and clearances, services routed against the actual structure, and congestion zones — plant rooms, risers, ceiling spaces — resolved in the model before they become site problems. Documentation follows NCC requirements and the relevant Australian Standards for each discipline, and fabrication-level detail is available where contractors prefabricate from the model.

MEP modelling deliverables

Engagements deliver the discipline models, coordinated documentation — plans, sections, schedules — clash detection reports with resolution records, and Revit MEP family content built or adapted for the project where the standard libraries fall short. For consultants we work inside your template and standards; for contractors we build to the fabrication tolerance your prefab workflow needs; for building owners we produce the as-built MEP models that make the next refurbishment cheaper.

Send the architectural and structural models — or the scan data for existing buildings — plus your services brief, and we will scope the Revit MEP services with disciplines, LOD and delivery schedule confirmed before work begins. Pilot plant-room packages are a common first engagement where teams want the coordination quality demonstrated on the hardest space first.

Coordination and clash workflow

MEP coordination runs as a cycle, not an event: discipline models federate in Navisworks, structured clash tests run — services against structure, services against services, everything against maintenance clearances — and genuine conflicts route to the responsible discipline with viewpoints attached. Resolution is verified in the next model issue, and the register tracks every clash from detection to closure. On congested projects we chair the coordination meetings; on well-run ones we feed the client’s existing process. The number that matters is clashes reaching site, and the workflow exists to drive it toward zero.

Common Revit MEP questions

Consultants ask about templates first: we work inside yours, including your families, view templates and sheet standards, so deliverables need no translation. Contractors ask about fabrication tolerance: fabrication-LOD modelling is available where prefab justifies it, with hanger and support detail included. Building owners ask about handover: models deliver with classification data populated for facility management systems where the contract requires it. And everyone asks turnaround — scoped per project, but plant-room pilot packages typically deliver inside two weeks and set the standard for the rest.

Related MEP and BIM capability

Revit MEP work connects naturally to the surrounding scope: MEP BIM modelling covers the coordination methodology in depth, Revit MEP families documents our library-building capability where standard content falls short, clash detection services run coordination across models authored by others, and electrical design carries the schematic and switchboard documentation that sits beneath the modelled services. For existing buildings, scan-to-BIM captures the as-built reality the new services must thread through.

MEP is also where building running costs live: the modelled services determine the mechanical plant that gets bought, the cable that gets pulled and the maintenance access that exists for thirty years. Modelling investment at design stage is trivially small against those numbers, which is why owners with whole-of-life accountability increasingly specify coordinated MEP models even where the head contract does not force them to.

Ready to start your
next CAD project?

Send the drawings, sketches or scope — we'll come back inside one business day with a no-obligation quote.

Get a free quote — 1800 287 223