A switchboard legend is the record that tells the next person at the board which device controls which part of the installation. On a small board it is the circuit chart inside the door. On a commercial or industrial board it is a set of engraved labels, a printed circuit schedule and a label schedule on the switchboard drawings. When those records disagree, the electrician isolating a circuit is left to work it out at the board, and that is a safety problem before it is a documentation one.
This guide covers what a switchboard legend needs to identify, how it ties into the single-line diagram and the switchboard general arrangement, and the checks worth running before a switchboard drawing package is issued. For the graphical symbols used on the drawings themselves, start with our Australian electrical drawing symbols guide.
Two things people mean by “switchboard legend”
The term is used for two different records, and many legend problems come from treating them as unrelated.
- The legend on the board. The circuit chart or schedule card, plus the labels fixed beside each device. This is what a person standing in front of the switchboard reads.
- The legend on the drawings. The symbol key on the single-line diagram and general arrangement, and the label schedule that lists every label, its text and where it goes.
On a well-run project the two are the same information. The label schedule on the drawings is what the label maker engraves, and the circuit chart is printed from the same device list. When the chart is typed up separately on site, or the drawings are revised without the chart being reprinted, the two drift apart. After that, nobody can say with confidence which one is right.
So treat the legend as one dataset with several outputs: the drawing schedule, the engraved labels and the printed chart. Change the data once and regenerate the outputs. Do not edit each output by hand.
What the Wiring Rules ask a legend to do
AS/NZS 3000, the Wiring Rules, requires equipment installed on a switchboard to be identified. The core principle is that the relationship of switches, circuit-breakers, fuses, RCDs and similar equipment to the parts of the installation they serve must be marked on or adjacent to the switchboard. The identification should let a person readily find both the equipment supplied and the protective device for that circuit. The standard also deals with identifying bars, links and terminals, and has separate marking requirements for main switches.
Read the identification requirements in the current edition before you set out a legend. Clause numbering and wording can change between editions, and the project specification will often add to them. The current edition is available from Standards Australia.
The practical test follows from that principle. Could someone standing at the board, without the drawings, work out which device isolates which equipment? Check every legend against that question, not against whether every position has some text in it.
What a good circuit legend identifies
The exact format depends on the board and the project, but a legend that passes the test above usually carries the following for each position.
| Field | Why it matters |
|---|---|
| Device reference | Must match the single-line diagram and the board schedule exactly, using the project’s tagging convention. |
| Circuit number | Links the device to the circuit references on the lighting and power layouts. |
| What is supplied | A specific description: “Lighting, Level 2 east office” or “Hot water unit HWS-1”, not “Lights” or “Power”. |
| Sub-board or equipment fed | For feeders, the name of the board or item supplied, so the distribution can be followed downstream. |
| Associated RCD | Where several circuits share a residual current device, which one protects the circuit. |
| Spare or space | A fitted device with nothing connected and an empty position are different things; mark them differently. |
| Revision and date | Lets the reader tell whether the chart matches the current as-built drawings. |
The description column is where many legends fall short. “General power” may have meant something to the installer on the day, but it is useless to a maintenance electrician three years later. Describe the area or equipment in the terms the building’s users and the layout drawings use.
Project and asset-owner specifications often go further than the minimum. One switchboard specification we hold asks for feeder labels showing the device number, the name of the sub-board supplied, the device setting or rating, and the connected cable size and type. It also requires printed circuit schedule cards in a protected holder inside the door. Another requires engraved labels on the front of protection enclosures identifying incoming and outgoing circuits, with the breaker rating and trip setting shown on the larger devices. Where a specification like this applies, it sets the content of the legend. Read it before the first label is drawn.
The label schedule: where the legend is drawn
On commercial and industrial switchboards the legend is set out on the drawings as a label schedule. Each label gets a unique number, its engraved text, and any size, colour or material the specification requires. Its position is keyed to the switchboard general arrangement so the board builder knows where it goes.
Asset owners with their own drafting standards usually prescribe the format. Water Corporation’s DS 24 Electrical Drafting standard is a useful public example. In it, each label is identified by a unique number that appears in the label schedule and is repeated in the material schedule against the equipment it identifies. On larger boards the layout, material schedule and label schedule normally sit on separate sheets, and they can share a sheet when the board is small. Where a switchboard is built from independent panels, the label numbers are prefixed by panel (A1, A2 for panel A; B1, B2 for panel B) so that each label is unique to its panel.
If the project has an owner standard, follow it to the letter, because the owner’s maintenance staff will read every board on the site the same way. If there is no owner standard, agree a convention with the designer and the switchboard builder before the first issue. Changing a label numbering system after the labels are engraved costs far more than settling it at the start.
Tie the legend to the single-line diagram and the GA
A legend is only as good as the cross-references behind it. Every device on the board appears in at least four places, and all of them have to agree.
| Document | What must agree with the legend |
|---|---|
| Single-line diagram | Device reference, the board it sits in, and the circuit or sub-board it supplies. |
| Board or circuit schedule | The same reference and description, plus the designer’s device and cable information. |
| Switchboard general arrangement | The physical position of the device and the label number placed beside it. |
| Label schedule | Label text that matches the schedule description word for word. |
| Lighting and power layouts | Circuit numbers on the floor plans that point back to the right board and position. |
The quickest way to find the breaks is to follow one circuit end to end: from an outlet on the layout, to its circuit number, to the board schedule, to the device on the single-line diagram, to its position on the GA, to its label. Then do the same in reverse, starting at a label. Our circuit breaker symbol cross-check guide walks through the same tracing method at the level of a single protective device.
A worked example
Take an illustrative distribution board, DB-L2, serving one floor of an office building. The tags and descriptions below are invented to show the method; they are not a recommended tagging system.
| Device | Circuit | Chart as found | Chart as corrected |
|---|---|---|---|
| CB-01 | L2-01 | Lights | Lighting, Level 2 east office |
| CB-05 | L2-05 | Power | GPOs, Level 2 kitchenette |
| CB-09 | L2-09 | HWS | Spare |
| Q-12 | Feeder | Sub-board | Feeder to DB-L2A, tenancy 2A |
Three kinds of fault show up here. CB-01 and CB-05 are vague: the chart is not wrong, it simply cannot answer the question a maintenance electrician will ask. CB-09 is a conflict. The chart says it supplies a hot water unit, but the as-built single-line diagram and the label schedule show it as a spare, because the unit was moved to another board during fit-out and only the drawings were updated. Q-12 hides a whole sub-board behind one word.
The fix is not a new chart. It is to settle what CB-09 actually supplies, with the electrician confirming on site and the designer confirming the intent. Then correct the device list once and regenerate the label schedule, the engraving list and the printed chart from it, all at the same revision.
Keeping the legend true after alterations
Legends are rarely wrong on handover day. They go wrong later, when a circuit is added for new equipment, a tenancy is re-planned, a device is swapped for a different rating, or a spare is quietly put to use.
- Update the source first. Mark up the single-line diagram and board schedule, then regenerate the label schedule and chart from them.
- Revise everything together. The chart should carry the same revision as the as-built drawings it was printed from.
- Treat handwritten additions as a warning. A pen entry on a printed chart usually means the drawings were never updated. It is the first thing to chase on an as-built survey.
- Keep the native files. A legend that only exists as a scanned PDF has to be redrawn before it can be maintained. Converting the existing switchboard drawings to CAD once makes every later update cheaper.
One limit is worth stating plainly. A legend supports safe isolation; it does not replace it. The drawings record what the installation is meant to be. The electrical worker on site still has to follow their own isolation and testing procedure before work starts.
Checks before a switchboard drawing package is issued
- Confirm which specification or owner drafting standard governs labels, and that its current revision is the one being used.
- Check that every device on the single-line diagram has a label in the label schedule, and that every label points to a real device.
- Match label text to the board schedule description word for word.
- Check that descriptions name a specific area or item of equipment, using the room names on the current architectural background.
- Confirm spares and spaces are shown consistently across the single-line diagram, GA, schedule and chart.
- Check label numbers are unique, including per-panel prefixes on multi-panel boards.
- Follow at least one circuit from the layout to the label and back again.
- Make sure the symbol legend on the drawings covers every symbol used on the sheets, and only those.
- Confirm the issued PDFs and the native CAD files carry the same revision.
For the symbol legend itself, the graphical symbols used in electrotechnical documentation are defined in the IEC 60617 symbol database. In practice most projects keep a project legend aligned with it, and our electrical drafting guide explains how the different drawing types use those symbols.
Getting switchboard drawings and legends prepared
ASTCAD provides electrical drafting services to electrical engineers, switchboard builders and facilities managers across Australia. Our electrical drafting services cover switchboard layouts, single-line diagrams, schematics and as-built updates, including PDF-to-CAD conversion of existing switchboard drawings with red-line mark-ups picked up.
To scope a switchboard package, send the current single-line diagrams, board schedules, any owner or project labelling specification, and photographs or mark-ups of the existing charts and labels through our contact page. Tell us whether the job is a new board, an alteration or an as-built record, so the drafting scope is clear from the outset.
Our team delivers accurate, standards-compliant drawings across all disciplines — fast turnaround, no obligation.